2019
- Earthmoving and waste management at the Office Garden - Budapest, XI. dist. Aliz street
- Excavation work in Budapest, XI. district Rupphegyi road - corner of Budaörs road
- Earthwork and road construction Budapest, XIV. district, Hermina u. - Former Transport Museum
- Constuction work and loading Budapest, XI. district, Alíz street 6. - Budai Bolero Residential Park
- Earthwork and waste management in Budapest, XI. district, Budafoki út 215. - former BVM concrete element factory
- Full waste recycling in Budapest, Olaf Palme Promenade 15-17. at The House of Hungarian Music
- Recycling of the materials generated during the development of Mill Park Offices office building at Skanska Magyarország Kft.
- Transportation of earth and stone waste, recycling at MOL Campus Budapest XI. district, BudaPart-Kopaszi-gát
- Budapest Liget Project, complete waste recycling related to the Ethnographic Museum development
- Complete waste recycling at the new OTP Headquarters Budapest XIII. district, Madarász Viktor u. 12-16.
- Comprehensive waste recycling related to the construction of the Nordic Light Trio Ltd. office building in Budapest, XIII. ker., Véső utca 7.
- Removal of the extracted soil in Budapest, XI. district, Vahot street
- Waste disposal in Budapest, XIII. district, Taksony street
- Waste disposal and recycling related to the construction of Handball Multi-hall, Budapest, Üllői út.
- Budapest, Gyáli út 18-20: demolition and waste management
- Szigetszentmiklós Sod Factory - earth works
- Waste management related to M0 roadway Hárosi Duna Bridge renovation
- Waste recycling of Pepco logistic center building
2018
- The complete earthwork of the Budai Bolero Lakópark in the Alíz sreet, Bp. XI.ker.
- Earthwork and road construction at Bodor street 2-4, Budapest, XIII.distr.
- Waste utilization at Baracska
- Waste utilization related to public utility construction in Budakalász
- Complete waste utilization related to the construction of the NordicLight Trió Ltd's office building in Budapest, XIII. distr.,Véső street 7.
- FCC Hungary Ltd. - construction work, substrate insulation delivery of Deponia
- Construction of the ABC Campus and the Athenor Office House in Budapest, Hungária Kft. 30.
- Utilization of wastes from the dismantling of Taurus Rubber Factory buildings in Budapest, VIII. ker., Kerepesi street 15-17.
- Waste recovery for the construction of the House of Hungarian Music, Budapest, Olof Palme prom. 15-17.
- Preparing demolition and waste recycling of the Mikes 48 residental complex in Budapest
- Complete waste utilization of the Néprajzi Múzeum within the Budapest Liget Project
- Waste utilization of the new OTP headquarter in Budapest XIII. Madarász Viktor street 12-16.
- Utilization of materials generated during the development of Budapest, Corvin Quarter
- Utilization of materials generated during the construction of the Nemzeti Lovarda
- Transport of used construction waste to the construction of the M4 motorway
- Transport of used construction waste for the construction of the M44 highway
- Transport of used materials to the construction of the Dagály Swimming Arena
- Transport gravel to the construction of the Prologis warehouses in Szigetszentmiklós.
- Utilization of materials generated by the development of the Skanska Magyarország Kft.'s Mill Park Office building
- Utilization of wastes arising from the refurbishment of the M5 motorway
- Transport of sandy gravel for the construction of Bilk Logistics Center
- Transportation of the uncontaminated soil from the reconstruction of the Százhalombatta railway
- Demolition of buildings and bases in the Soroksári út 58. and final disposal of extracted materials for recycling
2017
- CTP Biatorbágy Logisztikai központ fejlesztéséhez homokos kavics értékesítése
- sale of sand gravel for the development of Páty Industrial Park
- Utilization of materials generated during the railway development of Kelenföld-Százhalombatta
- Utilization of materials generated during the construction of the Budapest Elite residential park
- Utilization of materials generated during the construction of the Budapest Etele Pláza
- Utilization of materials generated during the Budapest One City Center development
- utilization of materials generated during the Budapest Hill Side Office Building project
- Utilization of materials generated during the development of the Budai Sports Center, Budapest
- Utilization of materials generated during the construction of the underground garage at József Nádor Square, Bp. V.dist.
- utilization of materials generated by tramway reconstruction, Budapest XI. district
- Utilization of materials generated by the development of the Skanska Magyarország Kft.'s Mill Park Office building
- Construction of Csepel harbor, sale of recovered material
- The complete earthwork of the Budai Bolero Lakópark in the Alíz sreet, Bp. XI.ker.
- Utilization of the materials generated during the demolition works of the Ferenc Puskás Stadium
- Utilization of materials generated from the demolition work of a house (built in 1850) in the Erkel street, in Budapest IX. district. Utilization Rate: 90%
- Utilization of materials generated during the bridge renewal at 37th km on the M0 motorway
- Utilization of materials generated during sewer construction work in the XVIII.district of Budapest
- Utilization of the materials generated during the demolition works of the OMRRK buildings
- Utilization of materials generated from hall construction works in the Nagytétényi street 72. Bp. XXII. district
- Utilization of materials generated during demolition work at Szabolcs Street Hospital
2016
- Utilization of materials generated by the development of the Skanska Magyarország Kft.'s Mill Park Office building
- Utilization of materials generated during the construction work of the Városmajor Park in Bp. XII.district
- Utilization of waste generated during the construction works of the Kamaraerdei road's rainwater drainage system
- Utilization of wastes generated from the demolition works of VOLÁN bus station, Bp. XIII.dist.
- Utilization of concrete elements generated from the elimination of billboards in Budapest
- Utilization of concrete parts of pylons that have been demolished on Pest County and Budapest owned by ELMŰ Ltd.
- Utilization of materials generated from the demolition work of the Sconto store in Bp. XIII. dist.
- Utilization of materials generated during the renovation of Széll Kálmán square
- Demolition of the residential district of Kondorosi, earthwork and recultivation, Bp. XI.dist.
- Complete waste management and internal demolition of the Southern Klotild Palace
2015
- Utilization of materials extracted from the construction of the Interspar department store at Iparos Street in Érd
- Utilization of materials extracted from construction work of the Barackos Út, Bp. XXII.dist.
- Utilization of materials generated from the investment of the Várkert Bazár
- Recultivation of a former landfill in the Meddőhányő street, Bp. XX.dist.
2014
- Utilization of secondary raw materials generated during wastewater investment in Diósd
- Processing, utilization and removal of waste placed under unknown conditions at Biatorbágy SCTP Ltd.
- Utilization of materials generated during the wastewaterinvestment at Budafok-Tétény
- Utilization of materials generated from the investment of the Várkert Bazár
- Constructions in the street in Költő utca, Budapest XII.district
- Recultivation of parcel nr. 8749. Biatorbágy
- Construction and utilization of excavated materials at Rétkerülő Utca 31-33. Budapest XL.distr.
- Határ utca 22. construction and exploitation of excavated materials, Szigetszentmiklós
- Construction of Nagykalapács utca – Kopár utca – Fülemüle utca – Párnás utca in Budapest XXI. distr.
- The canalization of Csókás street
- Construction of wastewater pressure lines and utilization of extracted materials in Érd- Budafok
- restoring gabion wall with pipe extrusion at the Premier Outlet, Biatorbágy
2013
- Érd, Kálvin tér 4. Utilization of materials extracted during the CBA warehouse construction work
- Utilization of materials generated during reconstruction of Aquincum HÉV line
- Pilisvörösvár- Esztergom railway development project use of secondary raw materials
- Utilization of secondary raw materials from the investment of the Várkert Bazár
- Utilization of materials generated from the investment of the Mobisz Logistics Center
- Utilization of materials generated during the development of the railway node in Pilisvörösvár
- Érd and vicinity project in waste water discharge resulting secondary raw material utilisation
- Widening of the M0 motorway
- Utilization of secondary raw materials generated during wastewater investment in Diósd
- Earthworks at the former Youth Park
- Widening the Danube Bridge
2012
- We cut down trees in the course of demolishing the Pharmaceutical Factory in the 22nd District, pulverized the wood and recovered it for use in power plants.
- Érd and vicinity project in waste water discharge resulting secondary raw material utilisation
- Utilization of secondary raw materials generated during wastewater investment in Diósd
- Performing warranty work on the M6-M0 connection service route
2011
- The Szekszárd Aqua Park was completed in 2011. We participated in the project from the very beginning until the completion of the pool complex.
2010
- The Dunaspirit project involved the construction of a flood control line parallel to the Route 6 primary flood control line in order to make sure the area could be revegetated without any problems.
2008
- We revegetated a former solid waste landfill on a 33-hectare area along the bank of the Danube in Budapest’s 22nd District.